Action: Parallel Block In Nintex Workflows Through SharePoint 2013 And Office 365

Welcome to an article on action Parallel Block in Nintex Workflows through SharePoint 2013 and Office 365. This article will display the action “Parallel Block” and how to configure it.

Most of the times we need a parallel action to run when a condition is satisfied. This parallel blocks helps the workflow to run faster taking less period of time and making two or multiple instances happening at the same time.

Let’s see how we’ll do it

  • Create a list, Dev Testing.

  • Click on the List tab on the Top ribbon and click on Nintex Workflows.





  • You will see the following screen, to create a new workflow.

  • Click on “Create new workflow”.









  • You will come to the design phase of the Nintex workflows.

  • Add the action, “Parallel Block” either by right clicks on the workflow or by dragging and dropping from the left toolbox.